Four-month ROI in Smart Meter Verification Equipped ELITE Meter

by | Mar 23, 2015 | Flow, Measurement Instrumentation

Maggie Schmidt

Maggie Schmidt

Flow Marketing Communications Manager / Blogger

In today’s petrochemical industry, you need to realize maximum value from every asset used in the process, and it’s essential that production stops only when absolutely necessary. One U.S. petrochemical manufacturer has found that differential pressure meters utilizing orifice plates just can’t deliver the accuracy and optimized operational costs that are so important to production and profits.

Two primary problems compelled this major petrochemical manufacturer to look for a more accurate, more easily proved meter technology in their custody transfer process. First, when the flow of ethylene reached low levels, the supply was shut off, even though production could have continued; with a 1% measurement accuracy, the orifice plates couldn’t handle high turndown levels during startup and in production. Second, proving was a disruptive exercise and meter health was often a mystery.

The solution? You’ll have to read the full petrochemical case study to get the complete story. But, what we can tell you here is that full payback was realized in less than four months, based on ethylene spot price and usage, and improved system accuracy.

Popular Posts

Comments

Follow Us

We invite you to follow us on Facebook, LinkedIn, Twitter and YouTube to stay up to date on the latest news, events and innovations that will help you face and solve your toughest challenges.

Do you want to reuse or translate content?

Just post a link to the entry and send us a quick note so we can share your work. Thank you very much.

Our Global Community

Emerson Exchange 365

The opinions expressed here are the personal opinions of the authors. Content published here is not read or approved by Emerson before it is posted and does not necessarily represent the views and opinions of Emerson.

PHP Code Snippets Powered By : XYZScripts.com