TL;DR Battery energy storage systems (BESS) are evolving from backup power assets into critical energy infrastructure. AI data centers are increasing demand for BESS solutions that can manage rapidly changing power loads. Modern BESS platforms help improve grid...
Data Centers
Data Centers Application Brief: Backup Power
Engineering backup generators for mission-critical availability and resilience Achieving uptime targets in high-density data centers requires power system redundancy and robust equipment designed for mission-critical operation. Ensuring the reliability of backup power...
Beyond Power: Why Operational Water Intelligence Is Essential for Modern Data Centers
Water Is Becoming a More Important Part of the Data Center Conversation Power availability has long shaped where data centers are built and how much capacity they can support. Now, AI’s rising thermal demands are bringing cooling capacity into sharper focus—and with...
Power Orchestration Is Becoming Essential for AI Data Center Growth
TL;DR AI data centers are creating unprecedented power demands that resemble grid-scale loads concentrated at a single site. Unlike traditional facilities, AI data centers can experience rapid power consumption swings in seconds or milliseconds. Battery Energy Storage...
AI Data Centers as Critical Infrastructure: Rethinking Control, Cooling, and Automation
In this video podcast, we explore how advanced control techniques like model predictive control (MPC), data fabric architectures, and AI-assisted operations can optimize cooling systems, improve uptime, and manage highly dynamic AI workloads more efficiently.
Isolation Valves: The Safety Switches of the Data Center Thermal Network
Cooling is the backbone of any data center, and Tier 3 and Tier 4 facilities run it through parallel loops. Isolation valves let operators take a pump, chiller, or air handler offline while cooling continues through an alternate path. Valve pressure drop also adds to pump load and Power Usage Effectiveness (PUE), so these choices compound across a facility.
Why Data Centers Are Rethinking Measurement Infrastructure
AI workloads are pushing rack densities to 100 kilowatts per rack or more, and the liquid cooling loops that support them add complexity that commercial meters were not built to handle. Any service interruption carries significant financial consequences through service-level agreement penalties. In some AI-focused facilities, cooling accounts for roughly 30 to 40% of total facility energy use, so measurement accuracy directly affects both cost and uptime.
AI Data Centers Need a Different Automation Strategy Than Traditional Data Centers
TL;DR AI training facilities operate very differently from traditional enterprise data centers. High-density AI workloads create dynamic power and cooling requirements that traditional infrastructure was not designed to handle. Many AI data centers rely on...
Integrated Automation Helps AI Data Centers Scale Faster and Operate More Reliably
TL;DR AI data centers are creating infrastructure challenges far beyond those of traditional enterprise facilities. Speed to market is becoming a major competitive advantage as demand for data center capacity continues to grow. Equipment shortages and long lead times...
Inside the AI Data Center Power Challenge: 30 Turbines, One Virtual Power Plant
Bill Kleyman, CEO and Co-Founder of Apolo.us and Executive Chair of Data Center Programs for Informa, talked with Bob Yeager, President of Emerson’s Power and Water Solutions business, about what it actually takes to keep that power stable once a site goes live.
Data Centers Application Brief: Thermal Management
Engineering reliable cooling distribution to manage extreme heat density and maximize uptime As the demand for generative AI is rising exponentially, so are rack densities. In the recent past, rack densities of 20 kilowatts (kW) were considered high. Today, it’s...
Build, Operate, and Scale Data Centers with Confidence Through Industrial-Grade Measurement
Data center project teams face mounting pressure from higher thermal loads, the adoption of liquid cooling systems, growing integration points between equipment, and aggressive schedules that leave little room for rework. In this environment, measurement is no longer simply about monitoring performance. It provides the operational confidence needed to commission systems faster, validate readiness, and maintain uptime.
Keep Up to Date With the Latest News and Updates
Follow Us
We invite you to follow us on Facebook, LinkedIn, Twitter and YouTube to stay up to date on the latest news, events and innovations that will help you face and solve your toughest challenges.
Do you want to reuse or translate content?
Just post a link to the entry and send us a quick note so we can share your work. Thank you very much.
Our Global Community
Emerson Exchange 365
This blog features expert perspectives from Emerson's automation professionals on industry trends, technologies, and best practices. The information shared here is intended to inform and educate our global community of users and partners.